Power cut in SP Energy Networks
Reference: INCD-2506538-i
SP Energy Networks (SPEN)
🟢 Restored
Outage type
🔴 Unplanned
Customers affected
—
Duration
1h 36m
Currently affected
0
No longer affected
102
Total postcodes recorded
102
Outage information
Reported
21 Sep 2026 11:02
First seen by PowerOut
21 Sep 2026 11:11
Last updated
22 Sep 2026 12:46
Estimated restoration
21 Sep 2026 18:00
Actual restoration
21 Sep 2026 12:48
PowerOut outage ID
#8548
Description
An unplanned power cut is affecting customers in the area.
Affected locations
No postcodes are currently being reported as affected.
Previously affected locations
SY13 1NR
SY13 1PX
SY13 1QY
SY13 1SG
SY13 1SY
SY13 1SZ
SY13 1TA
SY13 1TX
SY13 2AA
SY13 2AB
SY13 2AD
SY13 2AE
SY13 2AF
SY13 2AU
SY13 2BY
SY13 2EZ
SY13 2JT
SY13 2LG
SY13 3JH
SY13 3JJ
SY13 3JL
SY13 3JN
SY13 3JP
SY13 3JQ
SY13 3JW
SY13 3LB
SY13 3LD
SY13 3LE
SY13 3LF
SY13 3LG
SY13 3LP
SY13 3LQ
SY13 3LT
SY13 3LU
SY13 3LX
SY13 3LY
SY13 3NE
SY13 3NF
SY13 3NG
SY13 3NH
SY13 3NJ
SY13 3NL
SY13 3NN
SY13 3NP
SY13 3NR
SY13 3NS
SY13 3NT
SY13 3NU
SY13 3PG
SY13 3PL
SY13 4AA
SY13 4AB
SY13 4AD
SY13 4AE
SY13 4BF
SY13 4BL
SY13 4BN
SY13 4BP
SY13 4BT
SY13 4BU
SY13 4BW
SY13 4BX
SY13 4BY
SY13 4BZ
SY13 4DB
SY13 4DE
SY13 4DF
SY13 4DG
SY13 4DH
SY13 4DJ
SY13 4DL
SY13 4DN
SY13 4DP
SY13 4DQ
SY13 4DR
SY13 4DS
SY13 4DT
SY13 4DU
SY13 4DW
SY13 4DX
SY13 4DY
SY13 4DZ
SY13 4EA
SY13 4ED
SY13 4ES
SY13 4ET
SY13 4EU
SY13 4HA
SY13 4JP
SY13 4JT
SY13 4JX
SY13 4JY
SY13 4JZ
SY13 4LR
SY13 4NN
SY13 4NP
SY13 4NR
SY13 4NT
SY13 4NU
SY13 4NZ
SY13 4RB
SY13 8JT
Impacted locations
Currently affected
No longer affected
Locations shown are based on postcode and coordinate
information supplied to PowerOut by the network operator.
About this outage
PowerOut collects outage information from electricity network operators and presents it in one place. Information can change as the network operator updates the incident, so restoration estimates and customer counts may change over time.
Last information received by PowerOut: 22 Sep 2026 12:46
