Power cut in Northern Powergrid
Reference: INCD-834859-A
Northern Powergrid (NPG)
🟢 Restored
Outage type
🔴 Unplanned
Customers affected
1,301
Duration
2h 5m
Currently affected
0
No longer affected
82
Total postcodes recorded
82
Outage information
Reported
8 Nov 2026 21:33
First seen by PowerOut
8 Nov 2026 21:40
Last updated
8 Nov 2026 23:40
Estimated restoration
8 Nov 2026 23:03
Actual restoration
8 Nov 2026 23:45
PowerOut outage ID
#43489
Description
An unplanned power cut is affecting customers in the area.
Affected locations
No postcodes are currently being reported as affected.
Previously affected locations
S60 3EL
S60 3NF
S60 3NG
S60 3NJ
S60 3NL
S60 3NQ
S60 3NR
S60 3NT
S60 3NU
S60 3NX
S60 3NY
S60 3PA
S60 3PB
S60 3PJ
S60 3PL
S60 3PN
S60 3PP
S60 3PR
S60 3PT
S60 3PU
S60 3PX
S60 4BA
S60 4BL
S60 4BN
S60 4BP
S60 4BS
S60 4BT
S60 4BU
S60 4BW
S60 4BX
S60 4BY
S60 4JL
S60 4JN
S60 4JP
S60 4JR
S60 4JW
S60 4LA
S60 4LB
S60 4LD
S60 4LE
S60 4LG
S60 4LH
S60 4LL
S60 4LQ
S61 3RQ
S65 2HR
S65 2JA
S65 2JB
S65 2JD
S65 2JJ
S65 2JL
S65 2JN
S65 2JP
S65 2JR
S65 2JS
S65 2JU
S65 2JW
S65 2JX
S65 3AA
S65 3AB
S65 3AD
S65 3AF
S65 3AG
S65 3AH
S65 3AJ
S65 3AL
S65 3AQ
S65 3AW
S65 3AY
S65 3BE
S65 3BG
S65 3BH
S65 3BP
S65 3BS
S65 3BT
S65 3BW
S65 3EB
S65 3ED
S65 3EE
S65 3EF
S65 3JB
S65 3NN
Impacted locations
Currently affected
No longer affected
Locations shown are based on postcode and coordinate
information supplied to PowerOut by the network operator.
About this outage
PowerOut collects outage information from electricity network operators and presents it in one place. Information can change as the network operator updates the incident, so restoration estimates and customer counts may change over time.
Last information received by PowerOut: 8 Nov 2026 23:40
