Power cut in Northern Powergrid
Reference: PPCR80557
Northern Powergrid (NPG)
🟢 Restored
Outage type
🔵 Planned
Customers affected
2
Duration
1d 0h 0m
Currently affected
0
No longer affected
41
Total postcodes recorded
41
Outage information
Reported
3 Nov 2026 09:00
First seen by PowerOut
3 Nov 2026 00:05
Last updated
4 Nov 2026 00:00
Estimated restoration
3 Nov 2026 13:00
Actual restoration
4 Nov 2026 00:05
PowerOut outage ID
#39595
Description
Planned work is affecting the electricity supply in the area.
Affected locations
No postcodes are currently being reported as affected.
Previously affected locations
NE48 2AA
NE48 2AD
NE48 2AE
NE48 2AF
NE48 2AG
NE48 2AH
NE48 2AL
NE48 2AN
NE48 2AP
NE48 2AQ
NE48 2AS
NE48 2AT
NE48 2AU
NE48 2AW
NE48 2AX
NE48 2AY
NE48 2AZ
NE48 2BA
NE48 2BB
NE48 2BE
NE48 2BH
NE48 2BJ
NE48 2BL
NE48 2BP
NE48 2BS
NE48 2BT
NE48 2BU
NE48 2BX
NE48 2DB
NE48 2DG
NE48 2DQ
NE48 2DR
NE48 2DS
NE48 2DT
NE48 2EH
NE48 2JL
NE48 2JN
NE48 2JP
NE48 2JR
NE48 2JS
NE48 2JW
Impacted locations
Currently affected
No longer affected
Locations shown are based on postcode and coordinate
information supplied to PowerOut by the network operator.
About this outage
PowerOut collects outage information from electricity network operators and presents it in one place. Information can change as the network operator updates the incident, so restoration estimates and customer counts may change over time.
Last information received by PowerOut: 4 Nov 2026 00:00