Power cut in TQ13 9JF
Reference: PLANNED-INCD-44305-V
National Grid Electricity Distribution (NGED)
🔵 Planned
Outage type
🔵 Planned
Customers affected
263
Duration
9h 46m
Currently affected
27
No longer affected
0
Total postcodes recorded
27
Outage information
Reported
26 Oct 2026 14:00
First seen by PowerOut
26 Oct 2026 14:05
Last updated
26 Oct 2026 23:45
Estimated restoration
28 Oct 2026 12:00
Actual restoration
—
PowerOut outage ID
#33353
Description
Planned work is affecting the electricity supply in the area.
Affected locations
Previously affected locations
No previously affected postcodes have been recorded.
Impacted locations
Currently affected
No longer affected
Locations shown are based on postcode and coordinate
information supplied to PowerOut by the network operator.
About this outage
PowerOut collects outage information from electricity network operators and presents it in one place. Information can change as the network operator updates the incident, so restoration estimates and customer counts may change over time.
Last information received by PowerOut: 26 Oct 2026 23:45